SUPERPAN.org Hobbies - Model Rail

Construction - First track is laid
The latest pictures are at the top of the page.
Click on each image for a closer look
 
Once I had started the detailed track design for the fiddle yard, I decided that my original idea of a work top that covered the whole bench work was not going to work as I would not be able to easily route the wiring or access relays etc easily for other than the bottom level. Plan "B" was born, remove the bench work covering.
 
Click Here 2005/09/15 - Fiddle yard, East looking West
 
Click Here 2005/09/15 - Fiddle yard, West looking East
 
Click Here 2005/09/15 - Under the shelf is the work to be done!
Just in case you can not remember the wire sizes and colours,look at this spreadsheet.
 
Click Here 2005/09/06 - Shelf for the electronics (and junk) showing the start of the wiring for the second batch!
 
Click Here 2005/09/15 - The finished wiring for the first 8 sets of points and blocks. Still to be wired is the feedback, the power and signal to drive the points and blocks and the AC power to drive the point motors.
 
Click Here 2005/09/06 - The finished wiring, unfortunately it is only the 5 out of about 40 set of points!!
 
Click Here 22005/09/06 - The dangly bits! Some of the wires before they are connected
 
Top